top of page
2024-05-09 (2).jpg

1.1.1 - Introduction Legal Duties and Key Parties

1.1.2 - Project Description

1.1.3 - Project Timescale

1.2.1 - Building Structure & Fabric

1.2.2 - Building Services

1.2.3 - Site Works and Infrastructure

1.4.1 - Tree Report

1.4.2 - Flood Risk Assessment

1.4.3 - Noise Assessment

1.4.4 - Ecology Report

1.4.5 - Travel Plans

1.4.6 - Site Investigations

1.4.7 - Building Logbook

1.4.8 - CCTV Drainage Report and Footage

1.4.9 - SUDS Report

​

1.5.1 - Emergency Defect Contact

1.5.2 - Aftercare Plan & Introduction

1.5.3 - Service & Maintenance Schedule

1.5.4 - How to Avoid Blocked Drains

1.5.5- HSE Control of Legionella Bacteria Water Systems 

1.5.6 - Controlling Condensation & Mould

1.5.7 - Fire Door Regulations

1.5.8 - Maintaining Fire Doors

1.5.9 - Electrical Vehicle Charging Points

1.5.10 Fixflo Training​

2.1.1 - Structure and Fabric

2.1.2 - Building Services

2.1.3 - Site Works and Infrastructure

2.1.4 - Demolition

2.1.5 - Access Statement

2.1.6 - Any Hazards Associated with Materials Used

2.1.7 - Removal or Dismantling of Installed Plant and Equipment 

2.4.1 - Emergency Contacts

2.4.2 - Plans of Services to Site

2.4.3 - Shut Off Drawing / Isolation Points

2.6 - Key Structural Principles 

(Not applicable for this project) 

2.7.1 - Fire Strategy

2.7.2 - Fire Detection System

2.7.3 - Cause and Effect Matrix

2.7.4 - Fire Door Safety Regulations

2.7.5 - Regulations 38 Fire Safety Regulation

2.7.6 - Occupiers Fire Safety Responsibility​

2.8.1 - Winvic

2.8.2 - Architects

2.8.3 - Engineers

Finishes Schedule - Glancy Nicholls Architects 

Architects Drawings - Glancy Nicholls Architects 

Roofing & Cladding - ALD Group Ltd​

Brickwork & Blockwork - BF Brickwork 

Window and Curtain Walling - APIC UK Ltd

Internal Doors Inc. Ironmongery - Mansard Carpentry Ltd

Partitioning, Dry Lining and Suspended Ceilings - Roseville Contracts Ltd

Passive Fire Protection - Pryotect Ltd

Stainless Steel Staircase and Balustrades - MR Industrial Services Ltd

Internal Floor Finishes - The Commercial Flooring Company Ltd

Decorating - The Commercial Flooring Company Ltd

Mastic - G.L Mastic Ltd

Benches, Bins & Cycle Shelters - Bellsure Streetsure Ltd

Wall and Floor Tiling - Richmond Ceramics Ltd 

Blinds - Kaydee Sayfa Blinds

Landscaping - Whiting Landscaping Ltd 

Hard Landscaping & External Paving - GBK Contracting Ltd

Kitchen, Bathroom & White Goods - Deanestor Ltd 

White Lining - Riggotts Lining Ltd 

Engineers Final Drawings - CWA Associates Ltd

Precast Concrete - MPB Structures Ltd 

External Fencing - Nationwide Fencing Services Ltd

Piling - Ivor King Ltd 

Fixtures, Fittings & Equipment/ Joinery Amenity Area - J Carey Design Ltd 

Earthworks - A.R Demolition Ltd

Lifts - Kone Lifts Ltd

Mechanical - WM Building Services Ltd 

Electrical - EBM Electrical Services Ltd

Sprinklers - A&F Fire Sprinklers Ltd 

Signage - Ascot Signage Ltd 

Smoke Ventilation - Nationwide Specialist Projects Ltd 

​

4.1.1 - Mechanical Services

4.1.2 - Electrical Services

4.1.3 - Lifts

4.1.4 - SAP Calculations

4.1.5 - Air Test Certificates

4.1.6 - Acoustic Tests

4.1.7 - Fire Sprinklers

4.1.8 - Fire Doors

4.1.9 - Mansafe

4.1.10 - Dry Risers

4.1.11 - Noise Assessment 

4.1.12 - Access Control

4.1.13 - Passive Fire Control

4.1.14 - PV

4.1.15 - Water Chlorination

4.1.16 - Audio System 

4.1.16a - Displays Entertainment Lounge​

  • Apartment User Guide QR Code contains the following information:

  • Videos - Apartment Bathrooms, Apartment Electricals and Apartment Utilities Cupboard 

  • ​​​​​​​White Goods Manuals - Washer Dryer, Cooker Hood, Hob, Oven, Dishwasher, Fridge Freezer

​

All other QR codes are created from the below training and demonstration videos.

5.2.1 - Amenity Ventilation Overview

5.2.2 - Apartment Bathrooms

6.2.3 - Apartment Electricals

6.2.4 - Apartment Utilities Cupboard

6.2.5 - ATS Panel

6.2.6 - Basement Secondary Supplies

6.2.7 - Building Management System (BMS) and Central Air Conditioning

5.2.8 - CCTV

5.2.9 - Comms Room Local Air Conditioning

6.2.10 - Corridor Lighting

6.2.11- Data Cabinets

6.2.12 - Data Infrastructure

6.2.13 - DB Lighting and Power

5.2.14 - Disabled Refuge Panel

5.2.15 - Disabled WC Alarm

6.2.16 - External Lighting

6.2.17 - Fire Alarm and Manual Call Point (MCP)

6.2.18 - Fire Damper

6.2.19 - Intercom System

6.2.20 - Isolation Electric Points (DB)

6.2.21 - Landlord Services

6.2.22 - Lifts

6.2.23 - Main Incoming and Isolation Valves

6.2.24 - Outgoing Ways

6.2.25 - Smoke Ventilation

6.2.26 - Sprinkler System

6.2.27 - Stairwell Lighting

6.2.28 - Zip Water Heaters

6.1 - PC Checklist

6.2 - PC Certificate

6.3 - BRUKL/SBEM Certificate

6.4 - EPC Certificates

6.5 - SAP Calculations

6.6 - Building Regulations Certificates

6.7 - Warranties and Guarantees Schedules

6.7.1 - Warranties Schedule

6.7.2 - Guarantees Schedule

6.8 - Key Schedule

6.9 - Meter Readings

6.8.1 - Electric Meter Readings

6.8.2 - Water Meter Readings

6.8.3 - Gas Meter Readings

FILE INDEX

bottom of page