.jpg)
1.1.1 - Introduction Legal Duties and Key Parties
1.1.2 - Project Description
1.1.3 - Project Timescale
1.2.1 - Building Structure & Fabric
1.2.2 - Building Services
1.2.3 - Site Works and Infrastructure
1.4.1 - Tree Report
1.4.2 - Flood Risk Assessment
1.4.3 - Noise Assessment
1.4.4 - Ecology Report
1.4.5 - Travel Plans
1.4.6 - Site Investigations
1.4.7 - Building Logbook
1.4.8 - CCTV Drainage Report and Footage
1.4.9 - SUDS Report
​
1.5.1 - Emergency Defect Contact
1.5.2 - Aftercare Plan & Introduction
1.5.3 - Service & Maintenance Schedule
1.5.4 - How to Avoid Blocked Drains
1.5.5- HSE Control of Legionella Bacteria Water Systems
1.5.6 - Controlling Condensation & Mould
1.5.7 - Fire Door Regulations
1.5.8 - Maintaining Fire Doors
1.5.9 - Electrical Vehicle Charging Points
1.5.10 Fixflo Training​
2.1.1 - Structure and Fabric
2.1.2 - Building Services
2.1.3 - Site Works and Infrastructure
2.1.4 - Demolition
2.1.5 - Access Statement
2.1.6 - Any Hazards Associated with Materials Used
2.1.7 - Removal or Dismantling of Installed Plant and Equipment
2.4.1 - Emergency Contacts
2.4.2 - Plans of Services to Site
2.4.3 - Shut Off Drawing / Isolation Points
2.6 - Key Structural Principles
(Not applicable for this project)
2.7.1 - Fire Strategy
2.7.2 - Fire Detection System
2.7.3 - Cause and Effect Matrix
2.7.4 - Fire Door Safety Regulations
2.7.5 - Regulations 38 Fire Safety Regulation
2.7.6 - Occupiers Fire Safety Responsibility​
2.8.1 - Winvic
2.8.2 - Architects
2.8.3 - Engineers
Finishes Schedule - Glancy Nicholls Architects
Architects Drawings - Glancy Nicholls Architects
Roofing & Cladding - ALD Group Ltd​
Brickwork & Blockwork - BF Brickwork
Window and Curtain Walling - APIC UK Ltd
Internal Doors Inc. Ironmongery - Mansard Carpentry Ltd
Partitioning, Dry Lining and Suspended Ceilings - Roseville Contracts Ltd
Passive Fire Protection - Pryotect Ltd
Stainless Steel Staircase and Balustrades - MR Industrial Services Ltd
Internal Floor Finishes - The Commercial Flooring Company Ltd
Decorating - The Commercial Flooring Company Ltd
Mastic - G.L Mastic Ltd
Benches, Bins & Cycle Shelters - Bellsure Streetsure Ltd
Wall and Floor Tiling - Richmond Ceramics Ltd
Blinds - Kaydee Sayfa Blinds
Landscaping - Whiting Landscaping Ltd
Hard Landscaping & External Paving - GBK Contracting Ltd
Kitchen, Bathroom & White Goods - Deanestor Ltd
White Lining - Riggotts Lining Ltd
Engineers Final Drawings - CWA Associates Ltd
Precast Concrete - MPB Structures Ltd
External Fencing - Nationwide Fencing Services Ltd
Piling - Ivor King Ltd
Fixtures, Fittings & Equipment/ Joinery Amenity Area - J Carey Design Ltd
Earthworks - A.R Demolition Ltd
Lifts - Kone Lifts Ltd
Mechanical - WM Building Services Ltd
Electrical - EBM Electrical Services Ltd
Sprinklers - A&F Fire Sprinklers Ltd
Signage - Ascot Signage Ltd
Smoke Ventilation - Nationwide Specialist Projects Ltd
​
4.1.1 - Mechanical Services
4.1.2 - Electrical Services
4.1.3 - Lifts
4.1.4 - SAP Calculations
4.1.5 - Air Test Certificates
4.1.6 - Acoustic Tests
4.1.7 - Fire Sprinklers
4.1.8 - Fire Doors
4.1.9 - Mansafe
4.1.10 - Dry Risers
4.1.11 - Noise Assessment
4.1.12 - Access Control
4.1.13 - Passive Fire Control
4.1.14 - PV
4.1.15 - Water Chlorination
4.1.16 - Audio System
4.1.16a - Displays Entertainment Lounge​
-
Apartment User Guide QR Code contains the following information:
-
Videos - Apartment Bathrooms, Apartment Electricals and Apartment Utilities Cupboard
-
​​​​​​​White Goods Manuals - Washer Dryer, Cooker Hood, Hob, Oven, Dishwasher, Fridge Freezer
​
All other QR codes are created from the below training and demonstration videos.
5.2.1 - Amenity Ventilation Overview
5.2.2 - Apartment Bathrooms
6.2.3 - Apartment Electricals
6.2.4 - Apartment Utilities Cupboard
6.2.5 - ATS Panel
6.2.6 - Basement Secondary Supplies
6.2.7 - Building Management System (BMS) and Central Air Conditioning
5.2.8 - CCTV
5.2.9 - Comms Room Local Air Conditioning
6.2.10 - Corridor Lighting
6.2.11- Data Cabinets
6.2.12 - Data Infrastructure
6.2.13 - DB Lighting and Power
5.2.14 - Disabled Refuge Panel
5.2.15 - Disabled WC Alarm
6.2.16 - External Lighting
6.2.17 - Fire Alarm and Manual Call Point (MCP)
6.2.18 - Fire Damper
6.2.19 - Intercom System
6.2.20 - Isolation Electric Points (DB)
6.2.21 - Landlord Services
6.2.22 - Lifts
6.2.23 - Main Incoming and Isolation Valves
6.2.24 - Outgoing Ways
6.2.25 - Smoke Ventilation
6.2.26 - Sprinkler System
6.2.27 - Stairwell Lighting
6.2.28 - Zip Water Heaters
6.1 - PC Checklist
6.2 - PC Certificate
6.3 - BRUKL/SBEM Certificate
6.4 - EPC Certificates
6.5 - SAP Calculations
6.6 - Building Regulations Certificates
6.7 - Warranties and Guarantees Schedules
6.7.1 - Warranties Schedule
6.7.2 - Guarantees Schedule
6.8 - Key Schedule
6.9 - Meter Readings
6.8.1 - Electric Meter Readings
6.8.2 - Water Meter Readings
6.8.3 - Gas Meter Readings